Fully insured · WSIB covered · Written moisture test with every quote Mon–Sat 7am–6pm

Blog

If You Took Possession This Spring, Your Slab Is Ready Now

New Collingwood builds handed over in spring passed the 28-day concrete cure mark weeks ago. Coating before the first winter is the cheapest version of this job.

Published
June 23, 2026

A lot of the new builds around the south and east edges of Collingwood handed over between March and May. If that is you, the slab in your garage passed the 28-day mark some weeks ago, and this is the best window it will ever be in.

Why a new slab is the easy one

Everything that makes this job expensive is absent.

There is no salt damage to grind back, because the floor has not seen a winter. There is no oil staining to chase out of the concrete. There are no twenty-year-old tire marks, no previous coating to strip, no patched sections from a previous owner, and — assuming the builder did it properly — there is an intact polyethylene vapour barrier underneath, which means the moisture test is very likely to come back well inside tolerance.

Preparation on a new slab is a diamond grind and a vacuum. That is it. The price sits at the bottom of the range because there is genuinely nothing to repair.

Compare that to a slab off one of the older streets near the harbour, forty winters in, pitted and sandy, needing a polymer overlay before a coating can even be discussed. Same finished floor, roughly half again the cost.

The 28-day rule, and why we will not bend it

Concrete does not stop being wet when it stops being soft. It continues releasing water for weeks after the pour. The conventional minimum before applying a coating is 28 days, and a cold shoulder-season pour can want considerably longer than that.

Coat it early and the vapour still leaving the slab collects at the bond line and lifts the coating off. It looks exactly like a moisture failure, because it is one — the water just came from the concrete itself rather than the ground under it.

We get pushed on this constantly, and almost always for the same reason: the closing date, the move-in and the ski season do not line up with the concrete. The answer is still no. It is the one thing on this site we are inflexible about, because the failure is total, it turns up a year later, and redoing it is on us.

If your slab went in this spring, that is long behind you. If it goes in this autumn, we are talking about next year.

Do it before the first February

The argument is not appearance, though the appearance is real.

From November your car comes home off Highway 26 carrying brine, and it melts off onto the floor and sits there. Bare concrete drinks it. The chloride works into the slab and starts on the reinforcing steel, and once that process has started, coating the floor later does not undo it — it only stops it getting worse.

A slab coated before its first winter never begins. That is the whole case, and it is why this is worth doing in year one rather than year five.

What to check before you call anyone

Two things worth knowing about your own floor:

Ask the builder when the slab was poured, not when you took possession. Those can be months apart, and it is the pour date that matters.

Look at the control joints. The saw-cut lines should be clean and straight. On a new slab they are doing their job — the concrete cracks where somebody chose. Any coating quote you get should say how they are being treated, because filling them rigid and coating over is the standard shortcut and the joint comes back through within a couple of seasons.

One last practical note for anyone in a new subdivision: builders often pour a run of garages in the same week, and neighbours frequently want the same work. Four floors on one street in one visit is a materially cheaper mobilisation than four separate trips, and we price it that way.

FAQ

Related questions

How long after pouring can a concrete slab be coated?

28 days minimum, and a cold-weather pour can want longer. Fresh concrete releases water for weeks, and a sealed coating traps that vapour under the film and lifts it. The failure looks identical to a slab moisture problem, because it is one.

Should I coat a new garage floor before the first winter?

It is the cheapest version of the job you will ever get. There is no salt damage to repair, no oil staining and no tire marks, so preparation is a grind and a clean rather than a restoration. Every winter after that adds chloride to the slab.

How do I find out when my builder poured the slab?

Ask the builder directly, and ask for the pour date rather than the possession date — they are frequently months apart, and it is the pour date the 28-day clock runs from. On a large subdivision the site supervisor usually has it to the week.

Talk to a Collingwood floor coating contractor

Tell us the size of the bay, roughly when the slab was poured, and whether the building is heated. That is usually enough for a realistic range over the phone — and enough for us to say if you are in the small group of floors where the honest answer is to fix the water before spending anything on a coating.

(705) 555-0140

Mon–Sat 7am–6pm

(705) 555-0140 On-site quote within 3 business days