Insurance & WSIB clearance shown before work Mon–Sat 7am–6pm

Services

What we actually do

Most people arrive wanting the coating, and a meaningful share of them need the grinding or the resurfacing first — because a coating over an unprepared or failing slab is money spent twice.

Insurance
Certificate shown before work starts
Response
Same-day callback; visit booked at the first opening
Emergency

Talk to a Collingwood floor coating contractor

Tell us the size of the bay, roughly when the slab was poured, and whether the building is heated. That is usually enough for a realistic range over the phone — and enough for us to say if you are in the small group of floors where the honest answer is to fix the water before spending anything on a coating.

(249) 499-0859

Mon–Sat 7am–6pm

(249) 499-0859 Same-day callback; visit booked at the first opening Send details